RENEWABLES

In line with our strong commitment to sustainability, in 2006, we created Hychico, a subsidiary of Capex with a primary focus on renewable energies. This initiative reflects our ongoing commitment to the development of clean and sustainable energy sources, contributing to environmental well-being and a more sustainable energy future.
We have two wind parks, a solar park (under construction), a Hydrogen production plant and several projects to continue expanding the portfolio of renewable energies.

Hychico S.A.

Hychico has two main objectives:

  1. Energy generation through sustainable sources: We have developed a wind park to contribute to the generation of clean and sustainable energy.
    1. Integral development of hydrogen as an energy vector: We consider hydrogen as a versatile energy source, capable of being stored and used as raw material for other purposes, such as the production of «green» methane through the methanation process.

      We built a hydrogen and oxygen production plant through water electrolysis, reflecting our commitment of developing knowledge and expertise in renewable energy production and the use of hydrogen as a future energy source. We are focused on contributing to meeting the demand for energy at both the national and global levels sustainably and efficiently.

      Diadema Wind Park

      Diadema Wind Park is located about 20 km north-west of the city of Comodoro Rivadavia, province of Chubut, Argentina.
      Equipped with 9 Enercon E-44 wind turbines of 0.9 MW each.

      Wind Speed

      11,6m/s (average 2016)

      Installed capacity

      6,3 MW

      Capacity factor

      48,9% (average)

      OFF-TAKER: CAMMESA (PPA 15yrs or 361 GWh)

      Price: US$ 115.896/MWh

      Diadema II Wind Park

      Diadema II Wind Park is located adjacent to PED I and it is operated by the subsidiary EG Wind SA.
      Equipped with 9 Enercon E-82 wind turbines of 3.02 MW each.

      Speed Wind

      11,6m/s

      Installed capacity

      27,2 MW

      OFF-TAKER: Cammessa (PPA 20yrs)

      Price: US$ 40.27 + Incentive and Adj. factors

      HYDROGEN
      PLANT

      The hydrogen plant features two electrolyzers with a total production capacity of 120 Nm3/h of hydrogen and 60 Nm3/h of oxygen. The high-purity hydrogen (99.998%) is blended with natural gas to fuel a 1.4 MW generator equipped with an internal combustion engine specially adapted to operate with a mixture of rich and/or lean gas blended with hydrogen.

      Generador Rating

      1,4 MW of electric power

      Production Capacity

      60m3/h of oxygen

      120m3/h of hydrogen